20 August 2018

Project Manager and PMP Candidate Resources

I will add resources to this list as I come across them or as you identify them in your comments.  With my budget, the emphasis will be on free resources.

Webinars

Podcasts

  • Elise Stevens @ElisethePm
  • Lean Blog
  • People & Projects
  • Gemba Academy
  • Mastering Business Analysis
  • PM for the Masses
  • http://Manager-Tools.com

Sample Questions and Mock Exams

- Beware outdated content. Don't waste your time with any mock exam whose site does not clearly identify it as based on PMBOK 6.

PM Social Media Communities

- The lists below are in no particular order, and my listing of any group does not necessarily constitute a recommendation.
- Study tip: When studying sample questions posted online, look up the answers in the PMBOK and explain why the best answers are best and the other answers are less than best. Having to form complete thoughts helps you internalize the material and helps others learn, too.

LinkedIn
Google Plus
Facebook
- Requests for stolen IP are rampant in some of the Facebook groups. Please join me in discouraging it.
- Some sellers of test materials post the same sample questions in many PMP study groups, and their questions dominate the less-active groups; so many of the groups add little unique value.

Future Additions to This Page or New Pages

  • Business Analysis Resources
  • Continuous Improvement Resources

20 October 2016

Steps to Avoid Becoming Another Samsung

"What should I focus on or watch out for in order to prevent a calamity from happening to my business?"

Asked at http://www.mosaichub.com/answers/question/what-should-i-focus-on-or-watch-out-for-in-order-t#57652

Study Risk Management

  • I strongly suggest studying the Risk Management sections of Project Management Institute's (PMI's) Project Management Body of Knowledge Guide Guide (PMBOK). Add to that the corresponding chapter of a PMI-PMP (Project Management Professional) exam study guide such as the one by Rita Mulcahey.
  • If your organization can bear the cost, consider hiring an employee or consultant with a strong background in risk management to help establish a risk management program or to review the program you establish.
  • One such expert is Glen Alleman. I recommend the materials on his blog, Herding Cats.

Systematically Define Your Business and Identify Potential Risks

  • In general, you need to systematically define and examine every facet of your business, processes, products, services, and business environment. (The whole of the PMBOK Guide will help you classify those areas for projects.) As you examine each facet, you compile a list of risks. Clarification: I'm not saying you have to do it all at once.

Evaluate Risks

  • To evaluate the identified risks, you make a subjective, rough estimate of their effect and probability.

    Risk = Impact x Probability

    You then accept the low-risk items or place them on a watch list and make a more objective evaluation of high and medium risks.

Aleatory and Epistemic Risk

  • One of the characteristics of risk that you need to consider is what you know about the risk. Epistemic risks can be reduced by learning more about them. Aleatory risks cannot be reduced because there's a random element. For example, knowing how many sides dice have lets you know the possible range of values, and testing them can tell you whether loading or poor workmanship make some results more likely. On the other hand, after that, you cannot reduce randomness. This is part of the information you use when evaluating strategies for managing the risks.

Identify Candidate Responses

  • Identify possible responses (accept the risk, sidestep the risk (e.g., plan your road around the mountain instead of tunneling through it), reduce the effects, take steps to reduce the probability, transfer the risk to somebody else (outsourcing or insurance), or wait and see.

Evaluate, Select, and Implement Responses

  • Evaluate and select responses based on their cost and probability of success. Note that risk responses become policies, changes to processes, or new requirements. 

Monitor Responses and Watch List

  • Set up a risk monitoring system that tracks risks in the watch list as well as implementation of responses. This feeds into controlling performance and also into Lessons Learned (you have a Lessons Learned archive, don't you?) that save you work in the future.

Iterate and Integrate

  • Risk identification is iterative because risk responses can create secondary risks, because everything eventually changes, and because . Many companies miss new risks because they perform risk identification and planning and never re-visit the subject.
  • Many organizations delegate responses and leave them isolated from the . However, except for responses that are experimental (e.g., try it on a limited scale before rolling it out to the entire organization), they must be integrated into the business, project, product, etc.
  • Like process improvement, risk management (RM) needs to be part of a company's culture. Some say that RM should dominate status meetings because it is more proactive and more actionable, and also because "status" is actually a facet of risk.
Copyright 2016, Richard Wheeler

Steps to Avoid Becoming Another Samsung

"What should I focus on or watch out for in order to prevent a calamity from happening to my business?"

Asked at http://www.mosaichub.com/answers/question/what-should-i-focus-on-or-watch-out-for-in-order-t#57652

Study Risk Management

  • I strongly suggest studying the Risk Management sections of Project Management Institute's (PMI's) Project Management Body of Knowledge Guide Guide (PMBOK). Add to that the corresponding chapter of a PMI-PMP (Project Management Professional) exam study guide such as the one by Rita Mulcahey.
  • If your organization can bear the cost, consider hiring an employee or consultant with a strong background in risk management to help establish a risk management program or to review the program you establish.
  • One such expert is Glen Alleman. I recommend the materials on his blog, Herding Cats.

Systematically Define Your Business and Identify Potential Risks

  • In general, you need to systematically define and examine every facet of your business, processes, products, services, and business environment. (The whole of the PMBOK Guide will help you classify those areas for projects.) As you examine each facet, you compile a list of risks. Clarification: I'm not saying you have to do it all at once.

Evaluate Risks

  • To evaluate the identified risks, you make a subjective, rough estimate of their effect and probability.

    Risk = Impact x Probability

    You then accept the low-risk items or place them on a watch list and make a more objective evaluation of high and medium risks.

Aleatory and Epistemic Risk

  • One of the characteristics of risk that you need to consider is what you know about the risk. Epistemic risks can be reduced by learning more about them. Aleatory risks cannot be reduced because there's a random element. For example, knowing how many sides dice have lets you know the possible range of values, and testing them can tell you whether loading or poor workmanship make some results more likely. On the other hand, after that, you cannot reduce randomness. This is part of the information you use when evaluating strategies for managing the risks.

Identify Candidate Responses

  • Identify possible responses (accept the risk, sidestep the risk (e.g., plan your road around the mountain instead of tunneling through it), reduce the effects, take steps to reduce the probability, transfer the risk to somebody else (outsourcing or insurance), or wait and see.

Evaluate, Select, and Implement Responses

  • Evaluate and select responses based on their cost and probability of success. Note that risk responses become policies, changes to processes, or new requirements. 

Monitor Responses and Watch List

  • Set up a risk monitoring system that tracks risks in the watch list as well as implementation of responses. This feeds into controlling performance and also into Lessons Learned (you have a Lessons Learned archive, don't you?) that save you work in the future.

Iterate and Integrate

  • Risk identification is iterative because risk responses can create secondary risks, because everything eventually changes, and because . Many companies miss new risks because they perform risk identification and planning and never re-visit the subject.
  • Many organizations delegate responses and leave them isolated from the . However, except for responses that are experimental (e.g., try it on a limited scale before rolling it out to the entire organization), they must be integrated into the business, project, product, etc.
  • Like process improvement, risk management (RM) needs to be part of a company's culture. Some say that RM should dominate status meetings because it is more proactive and more actionable, and also because "status" is actually a facet of risk.
Copyright 2016, Richard Wheeler

31 July 2015

Two Steps toward Making Stakeholder Management Manageable

Two Steps toward Making Stakeholder Management Manageable

The materials I've found about Stakeholder Analysis have not explained much more than the PMBOK Guide explains. What grids other than the Power/Interest grid tell me remains a mystery.

However, I have found two hints that simplify the whole Stakeholder Identification (and Analysis) process.

Divide Stakeholder Analysis 

PMBOK 4 describes Stakeholder Analysis as a single Tool/Technique. I would split off the elicitation of information as a separate technique and call it Stakeholder Survey.

Use a form as you visit around the office eliciting detailed stakeholder information. Transfer that information to the Stakeholder Register at the end of the day. If you put the register on a server and can access it register through Wi-Fi, you can save on data entry time.

Fill in what you can before bothering stakeholders. Then verify that information and elicit the rest, as much as you can, face-to-face. For what remains, you can use a questionnaire.

Simplify through Progressive Elaboration 

Consider an analog in Risk Management: First, you use Qualitative Analysis to identify the key risks. Then you use Quantitative methods to analyze only the key risks.

Now, take these lessons from that model:
  • You don't need to perform full analyses for all stakeholders.
  • You need only a small subset of the information to start.
  • Decide what information you need in order to identify Key Stakeholders.
  • Use the Power/Interest grid to identify Key Stakeholders.
  • Collect further information and perform further analysis only on the Key Stakeholders.

Increase the degree of Stakeholder Analysis through progressive elaboration.

  1. First iteration: Key Stakeholders
  2. High Power/Low Interest stakeholders
  3. High Interest/Low Power stakeholders
  4. Low Interest/Low Power stakeholders

Remember, subsequent iterations should require less information and analysis.

This may be as much a delaying tactic as a simplification, which is what I really wanted. However, reducing, breaking up, and delaying the work relieves some of the stress of a potentially overwhelming process.

22 July 2015

3 Factors in Risk Management: Probability, Impact, and Velocity

Risk Score

Qualitative and Quantitative Analyses in Project Risk Management both take into account Probability (P) and Impact (I). A Risk Score is the product of the two.
Qualitative Analyses use subjective estimates of probability and impact as a screening process that categorizes risks for management, monitoring, or ignoring. Risks placed in the management category go on to Quantitative Analysis and Risk Response Planning.

What about Urgency?

A third value should be considered: Velocity (V), which is the inverse of the time-to-impact.
Seldom can we deal with all risks at once. The value of considering Velocity lies in prioritizing further effort so you have enough time to respond to urgent risks. We would not consider Velocity when assigning risks to the three categories because we want to deal with the important things, not the urgent things. (Consider Pareto's 80/20 rule.)
If Probability times Impact describes an area, then to be consistent, we would add Velocity as a third dimension. That is,
Priority Score = Priority x Impact x Velocity

Another View of the Priority Score

Priority times Impact has another label, which is Expected Monetary Value (EMV). EMV is often used by itself for guiding decisions. If we express the Priority Score as
Priority Score = EMV x Velocity
then we give EMV a weight equal to the weight of Velocity.
The reason we would not consider the Velocity by itself goes back to the principle about the cost of rework. The later you deal with a problem, the more it costs because you have to repeat and fix work that came before. The previous effort becomes wasted, costs rise, schedule lags, and you have to use extra resources to get back on schedule.
Similarly, the longer you wait to deal with a risk, the more rework you have to do. Therefore, we need to factor both Velocity and EMV into prioritizing work: Velocity to deal with urgent risks, and EMV to control costs.

A New Step: Priority Analysis (when needed)

I recommend inserting a new step into Risk Management when there are risks with high velocity and you have to prioritize which risks to deal with first:
  1. Qualitative Analysis with Risk Score = estimated Priority x estimated Impact
  2. Priority Analysis with Priority Score = EMV x Velocity = Priority x Impact x Velocity
  3. Quantitative Analysis with Risk Score plus other factors such as Velocity and Cost Effectiveness
I bring up Cost Effectiveness because you want to ensure that you don't spend $150 to prevent a risk whose EMV is only $100.

Reference

Hall, Harry, PMP, PMI-RMP. 30 Quick Risk Evaluation Tips. PM South. http://www.pmsouth.com/2015/07/18/30-tips/. Accessed 21 July 2015.

28 February 2015

The Black Hole of the Agile World: Systems Thinking

Agile fanatics (excuse me: practitioners) love to do things in tiny increments.

That's OK for products where bite-sized deliveries have value, but it's fantasyland for many real-world projects.

Take, for example, the design of a new car. Sure, you can break the car into systems -- chassis, body, safety package, motor, and so on. Waterfall does that, too, but let's consider the airflow over the body. The airflow is affected by the whole assembly. Every part affects the whole. You can't just design a fender in isolation and say, "Looky, looky, I've delivered value!" No, you've delivered an irrelevant piece of scrap.

In any course on Business Analysis, the importance of a unit on Systems Thinking cannot be overemphasized because the Agile world has completely forgotten its value. 

Before the 1990's, there was a role called Systems Engineer.

That title is still around, but the job is not. At least, the job has become a rare grain of wheat a vast field of tares.

A Systems Engineer had many skills of a project manager, a BA, a Systems Thinker, and a cross-disciplinary engineer, all rolled into one.



Along come companies such as Microsoft and Cisco, dropping the qualifying word from titles such as Network Systems Engineer, Software Systems Engineer, and Server Systems Engineer. Suddenly, every engineer, analyst, and administrator is a Systems Engineer. I wish I had a paycheck for every time a recruiter has contacted me with a so-called Systems Engineer job that turned out to be for an IT admin or a software coder.

True Systems Engineering jobs have become needles in a field of haystacks, and systems thinking has almost been forgotten.

Thousands of Systems Engineers lost their jobs due to decimation of the US Defense sector in 2009. (I proud of myself for not pointing out the predictable political element of that.) They still find three strikes against them:
  1. Transitioning to a different job category such as Project Management or Business Analysis
  2. Getting a foot in the door of a different industry (other than fast food)
  3. Living in a job market where all the growth is in part-time service jobs and has gone to low-skilled workers
Hiring managers would do well to consider bringing in experienced cross-disciplinary, systems thinkers. It would not take much training to bring them up to speed in new roles such as PM or BA.

Have you ever thought of a project as a system of people, or a product as a system of technologies? Systems Engineers do that instinctively, and such integrated systems thinking could prevent a lot of headaches for maturing companies.

Now, if you'll pardon me; I need to clean up a spill in aisle five.

01 June 2014

Differences between Risks and Issues, Part 2

Differences between Risks and Issues, Part 2

Threats; and Another Side of Risk

 
Part 1 (click here) of this series defined issue.

Threat versus Risk

If a situation, such as a cause and its effect, is certain, then it is an issue. With risk, we deal with uncertainty. If the probability of something is zero, it has no uncertainty. If the probability is 100%, again, it has no uncertainty. The term Risk only applies when

0% < probability < 100%

In Risk Management, we avoid the term "threat" because in everyday discussion, "threat" could also mean "promise of harm" or "logical sequence resulting in harm."

For example, a bully "threatens" to call you a bad name. If we believe the bully, this type of threat would be an issue, not a risk, because there is no uncertainty. If we don't care what the bully says, there is no effect, so it is neither a risk nor an issue.

Another side of risk

Most explanations of risk concentrate on the probability of the event. What if the event is certain, but you don't know what the effects will be?

Risk has two real parts:
  • Cause - A condition or possible change in conditions
  • Result - The effect that may happen
Risk has a probabilistic part, too:
  • Uncertainty
PMP study materials usually focus on uncertainty about whether the cause will happen. However, we can also have uncertainty about what effect a condition or change in conditions may cause.

Therefore, a condition (or change) may be certain, but you still have risk if you have uncertainty about the results.

As PMs, we are communicators. We listen. Others often use terms and definitions different from ours. So we ask people what they mean and negotiate a common vocabulary. We do this to control the risk of broken communications.

If we find that somebody says "the bully is a threat" and means "the bully poses a risk," then we could enter this in the Risk Log in one of three ways:
  • There is x% chance that the bully will call another worker a bad name, causing that worker to quit.
  • The bully will call another worker a bad name, and there is y% chance that the other worker will quit.
  • There is x% chance that the bully will call another worker a bad name and y% chance that the other worker will quit.
If there is 100% probability that the bully has or will call the coworker a bad name and a 100% probability that the coworker will or has quit, then we have an issue.

And if you go around calling my coworkers bad names, we have an issue.

Further study: Use a search engine to learn more about "aleatory variability" and "epistemic uncertainty." However, please don't ask me about them because, the way other authors explain them, I do not understand at all.

(c) Copyright 2014, Richard Wheeler

30 March 2014

Training the Software Requirements Engineer

What are different type of training required for a Software Requirement Engineer?

The correct answer is, it depends. Software requirements training should fit with the type of project management used by your organization.

One type of training you don't need

Many people think a software requirements engineer should thoroughly understand programming and software engineering. Obviously, you should know something about the software engineering discipline, but knowing too much can destroy your ability to write good requirements. This happens for two reasons.

First, good requirements should ignore the technology (such as which platform or language is used). This is because requirements should not dictate the solution; they should only define the problem to be solved. Devoting too much study to the technology will bias a requirements analyst toward particular solutions. This makes consideration of alternate solutions more difficult for the design engineers.

Second, requirements elicitation is an art as much as a discipline. Managing stakeholders, conducting meetings, choosing elicitation methods, and choosing methods for representing information require strong skills in psychology and communication. Putting all your energy into learning programming languages and tricks will cost you on the human side. It would be as great a mistake as putting all your energy into market research. You need to know enough about programming to win the respect of the designers and to communicate with them, but your job is to build a bridge between the customer and the designer.

What should I wear? Well... where are you going?

Organizations that work with large systems that integrate multiple technologies tend to follow traditional Project Management and Systems Engineering methods. They use some variation of the Waterfall model, such as the V model.

For a high-level understanding of Systems Engineering requirements methods, I recommend starting with INCOSE's (International Council on Systems Engineering) Systems Engineering Body of Knowledge (SEBOK) and using the SEBOK as a guide to subjects for study. Also consider studying Model-Based Systems Engineering, one subset of traditional methods, and SysML, the modeling language used for MBSE.

Organizations that work primarily with software tend to follow Agile project management methods. In Agile environments, requirements engineers tend to go by the title Business Analyst. I recommend starting with the IIBA's (International Institute for Business Analysis) Business Analysis Body of Knowledge (BABOK) and using the BABOK as a guide to subjects for study.

Agile is a set of principles and not an actual method. I have asked for a recommendation for a book that describes the different methods (such as Scrum and Kanban) but have been told no such book exists; for each Agile method, you need to find a different book.

The requirements methods differ considerably between traditional and Agile. Traditional methods nail down requirements and then negotiate schedule and cost. Agile nails down schedule and cost and then negotiates, prioritizes, re-prioritizes, and drops requirements.

The two methods do share some of the same tools. I suggest studying Unified Modeling Language (UML). UML is not a language, but a set of graphical methods for defining requirements. The most commonly recommended book on software requirements is Software Requirements, 3rd edition, by Karl E Wiegers and Joy Beatty.

15 July 2013

CPI: Earned Value (EV) Can Never Exceed Planned Value (PV)


Al succeeded with his very first project!  He was so proud of his project.  The customer was delighted and the Costs Performance Index was 1.1.  Yet, the program manager only graded the project as Satisfactory.  Al is so discouraged.  What was wrong with that program manager?

My new friend Bay -- an old friend of Allen, the new Project Manager -- clearly wanted me to be sympathetic toward his friend.  And he wanted me to share his negative feelings toward the program manager.

That is a shame, I replied.  Bay was studying for PMI's CAPM exam, so I decided to turn the moaning session into a project management lesson.  But you can help Al improve his project management skills if he will learn from this.

What do you mean? asked Bay.

What do you think the CPI of 1.1 means? I asked.

Bay thought a moment and replied, Al delivered more than required?

Why? I aked.

A CPI over 1 is good, and the customer is delighted, so Al delivered even more that what was required.

I baited Bay.  Those are all good things, but too much of a good thing can be bad.

How can that be?  Bay asked.

Delivering too much value might not mean you're efficient.  It might mean you're incompetent or even unethical. I wouldn't worry about that, though.  It's impossible to create a high CPI by delivering extra value.

That doesn't make sense, Bay protested.

Do you know what gold plating means in project management?

Uh-oh.  I see what you mean, he said.  I hoped I had him hooked and ready for the lesson.

The Dangers of a High CPI

Each organization has its own expectation for accuracy in estimating.  10% is a common tolerance, but a former employer of mine expected the final estimate to be accurate within +/- 5%.
  • Since a CPI of 1.1 represents a 10% deviation from the estimate, the PM's estimating skills come into question.
  • A CPI at or above the upper control limit of 1.1 means that planned resources have gone unused.  Managers scramble to find work for their employees.  People could lose their jobs.
  • A CPI above the upper control limit means that the company set aside funds for the project that it could have used to support other investments.
  • As you will see below, plenty of reasons exist for avoiding an excessive CPI.

Extra "Earned Value" Is Hidden

Al's CPI was 1.1.  If AC at completion equaled a Budget At Completion (BAC) of $1 M, then EV must have been $1.1 M because CPI = EV/AC.  That would mean that the PV at completion was $1 M.

While EV>PV is mathematically possible, it is not practically possible.  You will see that a CPI of 1.1 at project completion can only mean that the project underspent by 9.1%.

Suppose the scope says, deliver widgets A1 through A10.  When you create the Scope Management Plan, you schedule reviews to ensure that widgets A1 - A10 get delivered. Delivery of each has a pre-assigned value that is measured in the EV.

Suppose the team delivers widget A11, as well.  The Scope Management Plan assigned Earned Value to A1 - A10.  The customer paid for them.  However, the estimate did not include A11, so the customer did not pay for it and it was not included in the cost baseline. 

Since the Scope Management Plan did not include A11, the Quality Management Plan will not check to see whether it was delivered and the Cost Management Plan has no value estimate to assign to it.  Without assigning value, you cannot measure it or include it in the EV.

EV can precede PV during the project, but it cannot exceed PV at end of project.

For a CPI of 1 at end of project, EV = AC = BAC = PV.  If EV = PV = BAC, the only way to achieve CPI = 1.1 is if AC = (0.9090... x BAC).  This is because
CPI = EV/AC = PV/(0.9091 PV) = 1.1
 Thus, a high CPI at end of project can only result from spending less than planned.

The Dangers of Too Much Value

Gold plating refers to extra value given to a customer.  A company's policy may allow delivering extra value as an investment in future business.  For example, the phone company may sell you a $200 cell phone for 99 cents so you will sign a $100/month contract for the service that goes with it.  They expect to earn back the cost of the cell phone during the life of the contract and the following contracts.

In general, however, gold plating has a negative meaning.
  • Gold plating represents areas in which the project delivers value that the customer did not pay for.  Therefore, it represents a loss to the company.
  • If the estimate did not include the gold plating, then the PM's estimating skills come into question.
  • If the Scope, Cost, and Quality Management Plans do not prevent production and delivery of gold plating, then the PM's project planning and control skills come into question.
  • Even if the project stays within budget, gold plating represents missed opportunities to cut costs and increase the company's return on investment.
  • If the PM delivers significantly extra value, it not only raises an issue of an inaccurate cost estimate, it also raises an issue of whether the Seller overcharged the customer.  This raises an issue of the PM's ethics. 
Assigning planned value to A11 could cause major problems:  Suppose the PM anticipated that the team might deliver A11, assigned value to it, and included it in the EV.
  • The team fails to provide A10 but provides A11. The Cost Management Plan will indicate an EV of 100%, even though the project only delivered 90% of the authorized scope.
  • The team provides A1 - A11.  The customer can say, "your bid included A1 - A10. Since you were able to provide A11, as well, your bid was too high. We are reducing our payment accordingly."  The FFP contract provides the Buyer no protection from this if the Buyer feels he has good evidence that he was overcharged.
  • By stopping the team from delivering A11, the PM could have cut costs and increased profits.  This represents waste and lost profits.
  • Delivering A11 might be nice for the Buyer, but it could also be a white elephant.  Suppose the Buyer is a crop duster and A1-A11 are barrels of insecticide.  If the farmers only need ten barrels of spraying done, the pilot will be stuck with the expense of storing, guarding, and disposing of the extra barrel of poison.  That represents extra liabilities to the crop duster, as well as an extra burden on the environment.  If the Buyer refuses delivery of the extra barrel, you will be stuck with it.  If the barrel gets delivered, the Buyer may sue your company for his losses.

Conclusion

PM's view the CPI the same way you look at any other measurement done as part of statistical process control.  They work to prevent high CPIs by striving to accurately estimate expenses.

PM's also view gold plating as an issue and prevent it through careful project management planning and control.


Copyright 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.
 
IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees when you attend the live session. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

24 June 2013

So You Failed PMI's CAPM Test?

This is your first practical lesson in Project Risk Management. When your customer (PMI) specifies a parameter (x%), determine a safety margin so that, if you take the test on a bad day, you will still pass.

How many times did you read Rita's book? Most people read it AND the PMBOK Guide at least twice.

How many practice test questions did you take? Many people take thousands. (You can easily find thousands of free PMP practice questions on the web, although many are outdated and few will be up-to-date after July 31. CAPM questions are much harder to find.)

When you took the practice tests, did you research the answers you got wrong? Did you research the answers you had to guess at? Memorizing will only get you part way through PMI's tests; you need to dig and understand the material.

If you are taking the CAPM, you must want to become a PMP. Consider studying for the PMP exam. The deeper knowledge will give you understanding that goes beyond mere memorization for the CAPM exam. Also, for the PMP exam, you need to have 35 contact hours. Again, the extra effort would help you with the CAPM exam.

The two books I've heard the best reports about are Rita's books and the Head First books. You can also find many free podcasts on the web and on iTunes.

Two names to look for are Oliver Lehmann and Cornelius Fitchner. Oliver has some free apps and the best sample question on the web. Cornelius has some great 'casts, some of which are free.

Finally, when you have a tough time with some concept or a sample exam question, feel free to ask about it in the Google+ group, "Project Management, PMI, PMP Certification." Ask under the tab "PMP preparation questions." (Out of respect for copyrights, please identify the source of quotes.)

Other than that, I suppose there's not much you can do.

See Also


Copyright 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.
 
IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees when you attend the live session. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

20 June 2013

Make Lessons Learned a Part of Your Culture

An organization with process maturity will close the loop on Lessons Learned.

By closing the loop, I mean that the organization will ensure the capture, distribution, and institutionalization of the lessons taught by the school of hard knocks.

While the Project Manager should identify and collect Lessons Learned, Quality Assurance should categorize and preserve them.  QA should take further steps to communicate the lessons.

First, leaving it to everybody to go searching the LL database does not work.  Like that will ever happen! Ha!

Instead, QA should sort the LLs by function and subject and distribute the information to affected functional managers across the organization.  This ensures that, for example, the Integration Engineers in different programs and at different locations receive the expensively acquired knowledge.  If the functional managers fail to communicate the lessons to their people, upper management should give QA the authority to do so.

Second, QA should incorporate applicable improvements to the Organizational Process Assets.  This way, QA does not merely deposit critical knowledge into the Tribal Knowledge Bank, but actually institutionalizes it.  This introduces accountability when QA audits process compliance.  It also allows the lesson to be moved to a section of the database that lists rationales for historical purposes.  Not every Lesson Learned needs to be researched for normal operations.

Note that this involves Change Control at both the project level and at the organizational level.

As an example, engineers delivered documents to a customer without the necessary review and approval of the Chief Engineer.  The incident led to rework and incorrect customer expectations.

Tribal knowledge had established a channel that would have ensured proper review before release.  However, new employees did not know it, and management had nothing in writing that allowed them to discipline experienced employees who knew better.

Engineering stepped in where corporate management had left a gap.  They instituted processes for document review and approval and for an engineering communications manager to coordinate release of documents to clients.

Thus, an incident led to a Lesson Learned.  The Lesson Learned led to policy and procedural changes.  The new practice became part of the formal procedures and did not get lost in a database that ever researched.


Copyright 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.

IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

Agile, Waterfall, and PMI Project Differences

I've been asking about the differences between Agile projects and traditional project management.  Many explanations err by answering the question only from a software or Information Systems perspective.  While Agile primarily appears in the software industry, the different approaches appear in many industries and product areas.

Since the Project Management Institute (PMI) offers both Project Management Professional (PMP)® and PMI Agile Certified Practitioner (PMI-ACP)® certifications, it would seem that Agile contrasts against traditional project management. 

However, it would be more instructive to contrast the Agile approach against the "traditional waterfall approach" of Systems Engineering.  (Refer to the International Counsel on Systems Engineering (INCOSE) for details.)

Agile uses a highly iterative approach that works better when requirements are vague and must be defined over the course of the project.  It is more appropriate for, as an example, the next set of security updates to Windows or the next year's model of the Ford Mustang.

The waterfall approach assumes progressive or phased elaboration of a fixed set of requirements that can be defined, validated, and turned into a design architecture or solution, from top to bottom.

However, Agile methods can still be used for portions of the system, particularly peripheral functions of the software. It is more appropriate for, as an example, the core of MS Project 2015 or a new hybrid squirrel-electric vehicle.

 
Copyright 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.

IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

05 June 2013

Study Plan for PMP Certification (Early June 2013)

It's a little late to start studying for the PMBOK Guide, 4th edition, test. First, you have less than two months to join PMI, apply for the exam, prep for it, and arrange a test date, and pass the exam.   Second, the 5th edition is out, so a significant portion of knowledge based on the 4th edition is already obsolete.  Third, lots of people need to retake the exam; so if you need to retake the exam, you will have to re-study for the 5th edition test.
 
Classroom interaction is great, but online training has a lot of advantages, too. With my budget, schedule, and remote location, distance learning is an absolute must.  If I had the budget, I would take the training offered by Cornelius Fitchner at PM-Prepcast. Cornelius is also on Facebook at Project Management Prepcast.
 
I would add some warnings.  Preparing for the PMP exam should not be about learning to take the exam.  Boot camps teach to the exam.   That's alright, as long as you understand that a boot camp is just an orientation.  The learning takes place when you

 - Read the PMBOK Guide at least twice.
 - Master the material in one of the great reference books out there. (1)
 - Research the answers to a thousand or so practice questions. (2)

Finally, join the Project Management, PMI, PMP Certification community on Google+.  When you get stumped by a topic or a sample question, share your question.  We LIKE helping each other because, if something stumps one person, others probably have difficulty with it, too.  Besides, it drives us to learn the material. (3)

Studying for the PMP exam is just a starting point.  Getting a piece of wallpaper may help you get a job, but if you want a career, use your certification as a springboard to deeper studies of PM topics and further certifications.

Footnotes

(1) Rita Mulcahey's PMP Exam Prep has a wealth of information, and the Head First PMP book has gotten a lot of recommendations, too.
 
(2) Cornelius Fitchner has listed a number of free exam question sources on one of his sites. Make sure the questions correspond to the edition of the PMBOK Guide for which you plan to take the test.
 
(3) "Fair Use" allows sharing a limited number of questions for critique or discussion. To be fair to the person who wrote the question, cite the source; and to help the rest of us, provide a link.
 
Copyright 2011, 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.

IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

04 June 2013

What to Call Risk and Opportunity Management

Many writings lump risk management and opportunity management together under the label, Risk Management.  Risks and opportunities are left-pointing and right-pointing rays on the same line.

Many equate risk with probability, so they drop opportunity from the label. They think of risk as an abbreviation for risk and opportunity. Others worry, then, that opportunity will be forgotten -- as it usually is!

When one speaks of risk [and opportunity], one speaks of the probability that something will happen. That is,

Risk = Probability x Impact, where Impact is a loss

and

Opportunity = Probability x Impact, where Impact is a gain

If risks and opportunities are rays pointing left and right, then opportunities are negative risks. If you deal with them in the same matrix, pay extra attention to your negative signs.

Risk and opportunity management can result in influencing the probability, influencing the impact, or other strategies such as accepting a potential loss or waiting to deal with situations when and if they become an issues.

(Remember that a situation is a risk if the probability lies between zero and one.  A situation is an issue if the probability is one.)

Uncertainty Management

Could we simply call it Uncertainty Management?  Uncertainty would only deal with influencing the probability that something will occur. The face-value of the term fails to imply the other strategies for dealing with risks or opportunities. The name of this knowledge area should reflect the highest-level concepts, not a component concept.

Opportunities and Threats

Another pairing of terms comes from SWOT analysis - Strengths, Weaknesses, Opportunities, and Threats. SWOT analysis is one technique for identifying risks and opportunities.

Opportunities and threats, as a pair, emphasizes the influences or situations that affect or can be affected by a person or project. (In fact, threat implies that the risk event comes from outside, whereas risks can be either internal or external.)  SWOT analysis emphasizes identification of risks. It makes up only a fraction of the whole set of risk and opportunity management processes.

A Common Risk:  Failing to Deal with Opportunities

Many people forget to manage opportunities with the same vigor that they apply to managing risks.  Exploiting opportunities can mitigate the potential impact of risks. The reasoning goes, Risk A may set us back a week, but Opportunity B may save us a week.

PMs have other reasons to exploit opportunities.   Exploited opportunities cut costs, relieve schedule pressure, and improve quality. In short, they maximize profit.

Failure to exploit opportunities wastes resources, causes product lines to stagnate, erodes market share, and results in lost jobs (perhaps your job!) when the company withers.

The failure to exploit opportunities is itself a fundamental risk.

Therefore, referring to the practice as Risk and Opportunity Management calls attention to the oft-forgotten second half of the discipline. 

Remember that semantics is about communicating, not about winning arguments.  If somebody refers to risk management, you know what they mean.  Adjust.

Copyright 2011, 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.

IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

15 May 2013

How to Memorize PMP Formulas

Four Keys to Memorizing Anything

Memorization is like eating my biscuits. You use a knife and a cutting board to cut them into smaller pieces. Then you bite them into even smaller pieces with your incisor before chewing and chewing with your molars, sometimes on the right side of your mouth, then on the left side of your mouth.

Memorizing a formula, you use a pen and paper to break it into parts. Then you repeatedly work on the pieces. Sometimes you write them and sometimes you say them out loud so you involve more than one sense. Unlike my biscuits, you put the pieces back together in medium-sized pieces and chew on them for a while before putting the whole formula together and chewing on it.

The keys so far are
  • Smaller pieces
  • Repetition
  • Multiple senses
  • Reassembly

The Fifth Key to Memorization

The remaining key is (drum roll, please!)
  • Analysis
If you can understand a formula, you can recreate it without memorizing as much of it.

Example:  Point of Total Assumption in a Cost Reimbursable Contract

  • PTA = ((Ceiling Price - Target Price)/Buyer's Share)) + Target Cost
(I have limited the scope of this post to memorizing the formula, so please don't expect an explanation of Cost Reimbursable Contracts.)

The first step in analysis is to restate the formula in a fashion more visually decipherable.
  • PTA = Target Cost  +  (Ceiling Price - Target Price) / (Buyer's Share)
Notice that I turned the formula around.  I like to write formulas the way you would see it graphed: with the biggest portion first, at the bottom. Look at the inconsistent way most people present the Cost Estimating formulas, and taking this liberty will make even more sense.

The contract is Cost Reimbursable, so the first part of the PTA is what we hope the cost will be, the Target Cost.
  • PTA = Target Cost + some ugly fraction
The two price points above the Target Cost are the Ceiling Price and the Target Price. The Ceiling is higher, so it goes first:
  • (Ceiling Price - Target Price)/something
Something is the Buyer's Share.  Sorry, you'll just have to memorize that.

This is the point where you take total assumption of your own learning and put the formula back together. Remember, the keys to memorizing are
  • Smaller pieces
  • Repetition
  • Multiple senses
  • Reassembly
  • Analysis

05 May 2013

Differences between Risks and Issues in Projects, Part 1

Differences between Risks and Issues in Projects, Part 1

Issues

Updated 1 June 2014

People define issue in many ways, but in project management, issue has a special meaning.

In everyday English, one synonym for issue is topic. An issue is a situation that merits discussion. For example, the issue, what caused the last ice age or is man's contribution to climate change significant compared to factors such as volcanic ash and the variability of our star.

Everyday issues include past, present, and future situations. Discussions about issues may or may not lead to actions. Often, when we say that something is an issue, we imply that people disagree about it.

In project management, an issue is a situation that merits consideration because it affects the project. For example, the vendor left our parts to rust on the dock and will not ship them until they get paid, but our policy prohibits paying for the shipment until we receive and inspect it.

If the issue is significant, the project team will study actions that would reduce or remedy the situation effects on the project. This leads to change requests.

Part 2 (click here) focuses on the definition of risk and explains a side of risk that most PMP prep materials overlook.

Copyright 2013, 2014 Richard M. Wheeler

27 April 2013

Links to Management Resources

General Management Resources

Process Asset Samples and Templates

Project Management Newsletters

Project Management Resources

Project Management Tools

PM Social Media and Online Study Groups

Technical References

PM Blogs

PM Study and Free Resources

  • PM Study - Free Simulated Practice Test, Sample Guides and Podcasts, Work Experience Hour Calculation Tool
  • PM Success - 400 Questions of the Day
  • Head First Labs - Free PMP Practice Exam
  • Simplilearn - Articles and instructional videos

Agile Study and Free Resources

  • ScrumStudy - Free learning resources (including the ScrumStudy BOK) - Hat tip to Kylie Wilson in the Comments.

This is a work in progress. Add links to your favorites in the comments, below, and I'll add them.

10 April 2013

Understanding the Rule of Seven

Context: Discussion of the Rule of Seven in statistical process control 

Problem: In some industries, one cannot wait for repeatable errors as defects and errors lead to loss of life. I was told that, in pharmaceuticals, a certain % of death is acceptable and almost expected. The waiting process or period of time before halting tests or evaluations is where I am stuck.
First, let's use the terms specified value and control limit rather than errors or defects.
 
Also, we would normally discuss this topic in terms of parameters that have numeric values such as temperature, weight, and speed. In this conversation, we want to deal with measurable characteristics long before they result in catastrophic failures.

Rule 1. Out-of-bound conditions

If you have just one value outside the control limits, such as a severe side effect from a drug, you stop the process and figure out what went wrong. 

Rule 2. Calibrating the results

The Rule of Seven (or Run of Seven) does not apply to parameters that go outside the control limits. The Run of Seven applies when seven consecutive, acceptable values lie on the same side of the specified value. Such a situation indicates that the average has deviated from the desired value and you need to recalibrate the process so that the average is close to the specified value.

Illustrating with a made-up scenario

Suppose the scientists at Schpooky Pharmaceuticals want to test an inoculation against the HG (Heebie Geebie) virus. In order to train the immune system to fight off a full invasion of Heebie Geebies when somebody sneezes on us, the inoculation has to cause a fever of at least 0.5 degree F. They calibrate the variables in making the vaccine and in the dosage to cause a 1.0 degree F fever, or a temperature of 99.6 degrees F.  In this test, they set an upper control limit of 3.0 degrees, or a temperature of 101.6 degrees F.
 
Specifications:
  • T = 99.6 degrees F, average
  • 99.1 degrees F < T < 101.6 degrees F
Using the first rule, just one person develops a temperature of 103.0 degrees F. We stop the tests to see what's gone wrong because 103.0 > 101.6, the upper control limit.
 
Using the second rule, if we have seven consecutive people develop fevers between 99.6 and 101.6, we stop the tests to see what's gone wrong. These temperatures are all acceptable, but they are all greater than the desired value.
 
The Run of Seven indicates a special cause -- that is, one or more variables in the process need to be controlled. Maybe the dose is too large and needs to be reduced. Perhaps the HG virus needs to be baked five minutes longer. So we make the adjustments and then resume the trial.
 
These rules and others like them serve to stop a process long before it reaches catastrophic failure such as the death of a patient.

But catastrophic failures do happen

You might wonder, What about the catastrophic failures? They do happen! What about the one in 10,000 who dies? How can that be acceptable?
 
This takes us to other techniques such as Decision Tree analysis (p. 299 of the Project Management Institutes Project Management Body of Knowledge (PMBOK) Guide, 4th edition).
 
Suppose withholding the vaccine results in 1,000 deaths per 10,000, but giving the vaccine causes one death in 10,000. If you distribute the vaccine to 10,000, you save 999 lives.
 
Unfortunately, many drug companies withhold such drugs because that one in 10,000 will sue them, and the juries will severely punish the companies.
 
This issue, tort reform, is one of the dividing lines between the political parties in the US. A project manager needs to use various decision-making methods and maintain awareness of a wide range of environmental factors.

The Difference between Accuracy and Precision

In technology and science, accuracy and precision are different, although they go together.

For the measured characteristic
  • Precision is described by the range of values.
  • Accuracy is described by the difference between the average value and the specified value.
Lets have a goal of making two batches of cookies and specify that they measure 5" across. Afterwards, we measure the cookies.

Chocolate cookie widths
  • Average = 5.10 "
  • Range = 0.25"
Cinnamon cookie widths
  • Average = 5.01"
  • Range = 0.50"
The chocolate cookies have a smaller range of sizes, so they are more precise. The average size of the Cinnamon cookies comes closer to the specified value, though, so they are more accurate.
 
Does that seem counterintuitive?
 
For a measurement or a measuring tool
  • Precision is described by how many significant figures the tool gives you.
  • Accuracy is described by how closely the measurement matches the value of a standard device and also by how accurate the standard is.
As another example, I have two 18" rulers.
  • One came from a store that sells drafting supplies. It is graduated in 16ths of an inch.
  • The other, I made for myself after I loaned the store-bought ruler to a neighbor kid. I based it on one cubit (18"), the length from my elbow to my finger tips. When I graduated the cubit ruler in 50ths of an inch, I eyeballed the measurements and marked it by hand.
 The cubit ruler is more precise, but the store-bought ruler is more accurate.

24 March 2013

Project Management and Open Communications

Project Managers need to guard against setting up an environment where bad news never reaches them. They need to praise and encourage those who communicate risks before they become issues, issues before they become problems, and problems before they become project failures.

Some managers remind me of the Clinton trial in the Senate, following his impeachment in the House.

The Senate set up a rule requiring Ken Starr to keep all the records and evidence in another building. Bringing it to their offices without an invitation would have violated protocol.

Then the majority of senators refused to go view the evidence. A few who did view it said they came away weeping, and the rest (having refused to view the evidence) said that they lacked evidence sufficient to convict.

Does your comfort zone tempt you to maintain willful ignorance? Does your character allow reliance on plausible deniability? The PM has accountability for project success, which any lack of awareness may bring about; but that accountability extends to achieving success ethically.
 
I wonder:  Do PMs ever include ethical lapses as project risks?