20 August 2018

Project Manager and PMP Candidate Resources

I will add resources to this list as I come across them or as you identify them in your comments.  With my budget, the emphasis will be on free resources.

Webinars

Podcasts

  • Elise Stevens @ElisethePm
  • Lean Blog
  • People & Projects
  • Gemba Academy
  • Mastering Business Analysis
  • PM for the Masses
  • http://Manager-Tools.com

Sample Questions and Mock Exams

- Beware outdated content. Don't waste your time with any mock exam whose site does not clearly identify it as based on PMBOK 6.

PM Social Media Communities

- The lists below are in no particular order, and my listing of any group does not necessarily constitute a recommendation.
- Study tip: When studying sample questions posted online, look up the answers in the PMBOK and explain why the best answers are best and the other answers are less than best. Having to form complete thoughts helps you internalize the material and helps others learn, too.

LinkedIn
Google Plus
Facebook
- Requests for stolen IP are rampant in some of the Facebook groups. Please join me in discouraging it.
- Some sellers of test materials post the same sample questions in many PMP study groups, and their questions dominate the less-active groups; so many of the groups add little unique value.

Future Additions to This Page or New Pages

  • Business Analysis Resources
  • Continuous Improvement Resources

31 October 2016

Corrections to LinkedIn's Course, Business Analysis Fundamentals

LinkedIn's inLearning course (apparently they got it from Linda.com), Business Analysis Fundamentals, provides plenty of useable information. However, I was frustrated with a number of points. The most damaging were the course's confusion about Validation, Verification, Traceability, and Stakeholders.

  • You validate requirements by confirming that they have authority, are necessary, and meet standards for quality. Validation looks upward.

  • You verify that requirements are met either by lower-level requirements or by the product. Verification looks downward. Methods include Inspection, Analysis, Test, and Demonstration.

  • The course reversed these distinctions and identified only Test as a method of verification.

  • Traceability links each requirement to directly-related higher- and lower-level requirements. Traceability enables validating requirements' authority and verifying their satisfaction.

  • The course's discussion of traceability focused on metadata about requirements' sources. While such information is useful, it is a very minor part of traceability.

  • Stakeholders include everybody who "has a stake in" the project.  The course focused on external stakeholders. It should have included the project team and other internal relationships such as other projects.

  • The course's definition of Functional Requirements includes activities that the project needs to do to deliver the product. It should also have included what the product does and how well it does it.

  • Since the course only half understands what constitutes functional requirements, it classifies Performance among nonfunctional requirements. Project performance is nonfunctional, but product performance is functional.

  • The course treats Transitional Requirements as a separate category. If the project performs a service, transitional requirements can be Functional requirements; and if the project creates a product, they are usually nonfunctional.

  • The T in SMART stands for Time-bound. The course replaces this with Traceable. The substitution is a good one, but it is nonstandard, and it requires that you include temporal requirements in Specific.

As I said, the course provided plenty of actionable content. I would be proud to work with the instructor, and I would learn a lot more from him that he would learn from me. However, we'd have to work out some issues, first.

28 February 2015

The Black Hole of the Agile World: Systems Thinking

Agile fanatics (excuse me: practitioners) love to do things in tiny increments.

That's OK for products where bite-sized deliveries have value, but it's fantasyland for many real-world projects.

Take, for example, the design of a new car. Sure, you can break the car into systems -- chassis, body, safety package, motor, and so on. Waterfall does that, too, but let's consider the airflow over the body. The airflow is affected by the whole assembly. Every part affects the whole. You can't just design a fender in isolation and say, "Looky, looky, I've delivered value!" No, you've delivered an irrelevant piece of scrap.

In any course on Business Analysis, the importance of a unit on Systems Thinking cannot be overemphasized because the Agile world has completely forgotten its value. 

Before the 1990's, there was a role called Systems Engineer.

That title is still around, but the job is not. At least, the job has become a rare grain of wheat a vast field of tares.

A Systems Engineer had many skills of a project manager, a BA, a Systems Thinker, and a cross-disciplinary engineer, all rolled into one.



Along come companies such as Microsoft and Cisco, dropping the qualifying word from titles such as Network Systems Engineer, Software Systems Engineer, and Server Systems Engineer. Suddenly, every engineer, analyst, and administrator is a Systems Engineer. I wish I had a paycheck for every time a recruiter has contacted me with a so-called Systems Engineer job that turned out to be for an IT admin or a software coder.

True Systems Engineering jobs have become needles in a field of haystacks, and systems thinking has almost been forgotten.

Thousands of Systems Engineers lost their jobs due to decimation of the US Defense sector in 2009. (I proud of myself for not pointing out the predictable political element of that.) They still find three strikes against them:
  1. Transitioning to a different job category such as Project Management or Business Analysis
  2. Getting a foot in the door of a different industry (other than fast food)
  3. Living in a job market where all the growth is in part-time service jobs and has gone to low-skilled workers
Hiring managers would do well to consider bringing in experienced cross-disciplinary, systems thinkers. It would not take much training to bring them up to speed in new roles such as PM or BA.

Have you ever thought of a project as a system of people, or a product as a system of technologies? Systems Engineers do that instinctively, and such integrated systems thinking could prevent a lot of headaches for maturing companies.

Now, if you'll pardon me; I need to clean up a spill in aisle five.

04 May 2014

Trusting the Project Team

Vikas Gupta asks on Google Plus, pretty well answering his own question:
How much can/should a Project Manager interfere in the technical details of a project? For e.g. If a developer thinks that xyz is the most efficient way of implementing a functionality, is it unproductive for the Project team to have PM challenge that beyond a limit? I personally think that challenging the team members is ok, but a PM must trust the technical skills of team members and too much interference may demotivate the team.. Thanks in advance for your expert opinion!
 Discussion Link April 30, 2014

Project-Aria replied,
It is rare that a PM is just a PM.
Usually the PM also adds value by bringing technical expertise. Now the question here is: does the PM have the expertise in technical area in question. If yes, then yes. If no, then interference may be a dangerous path.
I would also note that communicate is a 2-way challenge. It is also important to all team members, including experts, to be able to explain their ideas and convince others. It is important for the expert to be able to communication without hiding behind a expert-cryptic language.
Apr 30, 2014

I think Vikas stated it well and correctly. Early in each design phase, the PM can ask the team to consider his personal favorite solution. The design team should then compare the various options for each architectural element and weigh them against each other. The result is a trade study that weighs the trade-offs and makes an objective recommendation of the best solution.

Unless the decision is very close, the PM should leave the decision to the results of the trade study. If he does not, it can reflect badly on him.
  • It indicates that he did a poor job of selecting his team.
  • It insults the design team and, as Vikas said, demotivates them.
  • It may indicate that he failed to have the design team include his favorite option in the trade study.
  • It may indicate that he failed to properly define the design parameters.
  • It indicates subjectivity, a failure to rely on objective evidence produced by the trade study.
  • It turns the time and cost of trade studies into waste.
  • Failure to trust often results from projection; that is, expecting others to do what you would do. Therefore, it raises issues about the PM's ethics.
  • Overriding the results of a trade study can create an appearance of impropriety (for example, the PM appears to take a bribe from the selected vendor or subcontractor).
As Project-Aria stated, the PM may bring enough technical expertise to deserve the right to override the design team; but he had better have convincing technical reasons for his actions and had better own up to his mistakes that made his action necessary.

If your experience has shown you more reasons why a PM should or should not override the decisions of his design team, I'd like to hear from you in the comments.

18 January 2014

Put Off Blaming Procrastination

Work will always expands to fit the schedule.

Recent posts on the theme of procrastination, or more specifically, finishing work on deadline rather than early, have stepped on my toes. I'd like to speak up on behalf of my fellow "procrastinators."

The theme implies that people have nothing to do besides that One Task. It implies that they sit around playing games and don't have to scramble to meet multiple, simultaneous, arbitrary deadlines and then die inside when people criticize the lack of perfection.

On Time is Late -- Are you sure about that?

Before dealing with "procrastination," one should question the value of beating deadlines rather than meeting them.

The Lean principle of Pull states that early delivery can cause waste. Normally, one thinks of storage costs as waste, but doing work before it's needed presents other costs. For example, racing to complete a task might sacrifice planning, risk management, or quality. It might also cause neglect of lower-priority tasks or accelerated cost of funds.

The real schedule-waster is not procrastination. The great Time Thieves are multitasking and perfectionism.

The assignments will multiply to fill the schedule.

Multitasking eats up time by inserting course changes into the day. Human minds are not like Intel chips with four independent CPUs. It takes time to push task A into the stack, bring up task B, recall where you left off, and start making progress again. Moreover, what manager will forgive neglecting task A, which is due tomorrow, just so task B can be completed a day ahead of its due date one week from now?

The reach for perfection will stretch to the deadline.

Management teaches "procrastination" by forgetting to balance constraints. If you expect perfection in any human endeavor, expect employees to pour every available hour into quality.

Managers who want early deliveries need to increase collaboration with their reports. That means, first, avoiding micromanaging, but still sharing enough involvement to guide energies toward the right balance between progress and quality. It means, second, putting themselves in a position to say, "Stop! That's good enough," when the task reaches sufficient progress and quality.

The prevalence of multitasking and perfectionism make "procrastination" not a performance problem, but a management problem. Sure, when employees fail to adapt, it becomes a performance problem; but I caution against pointing fingers at the effects when the cause lies within Leadership's hands.

05 June 2013

Study Plan for PMP Certification (Early June 2013)

It's a little late to start studying for the PMBOK Guide, 4th edition, test. First, you have less than two months to join PMI, apply for the exam, prep for it, and arrange a test date, and pass the exam.   Second, the 5th edition is out, so a significant portion of knowledge based on the 4th edition is already obsolete.  Third, lots of people need to retake the exam; so if you need to retake the exam, you will have to re-study for the 5th edition test.
 
Classroom interaction is great, but online training has a lot of advantages, too. With my budget, schedule, and remote location, distance learning is an absolute must.  If I had the budget, I would take the training offered by Cornelius Fitchner at PM-Prepcast. Cornelius is also on Facebook at Project Management Prepcast.
 
I would add some warnings.  Preparing for the PMP exam should not be about learning to take the exam.  Boot camps teach to the exam.   That's alright, as long as you understand that a boot camp is just an orientation.  The learning takes place when you

 - Read the PMBOK Guide at least twice.
 - Master the material in one of the great reference books out there. (1)
 - Research the answers to a thousand or so practice questions. (2)

Finally, join the Project Management, PMI, PMP Certification community on Google+.  When you get stumped by a topic or a sample question, share your question.  We LIKE helping each other because, if something stumps one person, others probably have difficulty with it, too.  Besides, it drives us to learn the material. (3)

Studying for the PMP exam is just a starting point.  Getting a piece of wallpaper may help you get a job, but if you want a career, use your certification as a springboard to deeper studies of PM topics and further certifications.

Footnotes

(1) Rita Mulcahey's PMP Exam Prep has a wealth of information, and the Head First PMP book has gotten a lot of recommendations, too.
 
(2) Cornelius Fitchner has listed a number of free exam question sources on one of his sites. Make sure the questions correspond to the edition of the PMBOK Guide for which you plan to take the test.
 
(3) "Fair Use" allows sharing a limited number of questions for critique or discussion. To be fair to the person who wrote the question, cite the source; and to help the rest of us, provide a link.
 
Copyright 2011, 2013, Richard Wheeler -- Permission granted for non-profit or personal use with a link to this post.

IT Metrics and Productivity Institute (ITMPI) Premium membership gives members free access to 400 PDU-accredited webinar recordings and waives the PDU processing fees. The library is growing at about 100 webinars per year. Check it out: http://mbsy.co/dPHm?s=e

27 April 2013

Links to Management Resources

General Management Resources

Process Asset Samples and Templates

Project Management Newsletters

Project Management Resources

Project Management Tools

PM Social Media and Online Study Groups

Technical References

PM Blogs

PM Study and Free Resources

  • PM Study - Free Simulated Practice Test, Sample Guides and Podcasts, Work Experience Hour Calculation Tool
  • PM Success - 400 Questions of the Day
  • Head First Labs - Free PMP Practice Exam
  • Simplilearn - Articles and instructional videos

Agile Study and Free Resources

  • ScrumStudy - Free learning resources (including the ScrumStudy BOK) - Hat tip to Kylie Wilson in the Comments.

This is a work in progress. Add links to your favorites in the comments, below, and I'll add them.

24 March 2013

Project Management and Open Communications

Project Managers need to guard against setting up an environment where bad news never reaches them. They need to praise and encourage those who communicate risks before they become issues, issues before they become problems, and problems before they become project failures.

Some managers remind me of the Clinton trial in the Senate, following his impeachment in the House.

The Senate set up a rule requiring Ken Starr to keep all the records and evidence in another building. Bringing it to their offices without an invitation would have violated protocol.

Then the majority of senators refused to go view the evidence. A few who did view it said they came away weeping, and the rest (having refused to view the evidence) said that they lacked evidence sufficient to convict.

Does your comfort zone tempt you to maintain willful ignorance? Does your character allow reliance on plausible deniability? The PM has accountability for project success, which any lack of awareness may bring about; but that accountability extends to achieving success ethically.
 
I wonder:  Do PMs ever include ethical lapses as project risks?

19 March 2013

Life Cycle Costing for Project Planning

Life cycle costing looks at the cost of the whole life of the product, not just the cost of the project.

A product has two major groups of life cycle phases, the project phases that conceive, design, produce, and deliver the product, and the Operations and Maintenance (O&M) phases where the owner operates, maintains, and decommissions the product.

Some products also have phases where proof of concept testing, design refinement, and prototyping overlap with O&M phases.

(A lot of PMs forget decommissioning. As an extreme example, think about how a chemical or nuclear waste site might require maintenance and protection for the nest 500,000 years.)

The project scope should define the design philosophy. The customer may want a cheap, disposable product, so the design team would not put much effort into designing for low maintenance, low manning, or long service life.

On the other hand, Operations costs such as building more units, maintenance, training users, expansion and modification, providing consumables, transporting, installing, and disposing of waste can far outweigh the initial costs.

The scope statement and the nature of the product will guide in deciding which aspects, if any, of life cycle costing to include in project planning.

11 March 2013

Slack, Float, and Critical Path Methodology

So as the PM I want to locate the longest path, because it will assure that I meet the project deadline.
Correct. But don't look for the "longest path," look for the "critical path." They are the same, but when you say critical path, you indicate that you know the best way to find it.
The shortest path, which has no slack, tells you as the PM that you will not be able to meet the deadline for the project.
Forget 'shortest path.' What tells you that you will not be able to meet the deadline is an end-to-end path having "negative slack." More about that later.
 
Slack is about an individual activity. Float is about how that activity's slack relates to the activities around it. They are the same thing viewed from slightly different perspectives.
 
Here's a source of confusion that I have yet to seen or hear anyone explain: For the critical path, we look for a path from the Start to Finish that has either zero or a negative number for the slack of all its activities. When we talk about a path that has slack (for example, 2 days), however, we talk about that single branch, not about a whole Start-to-Finish path.
 
Did you do connect-the-dots pictures as a child? Lets do a mental experiment. Imagine replacing all the boxes in a network diagram with their slack numbers. If there is enough time to do the project, you will see a path of zeroes from Start to Finish. In your mind, go over that path with a highlighter. That is the critical path. The durations of those boxes add up to the shortest time in which the project can be completed.
 
Suppose you add up the durations of the activities along the critical path, and the sum is 42 days. If the deadline is in seven weeks (49 days), then you have enough time.
 
If Sales promised the customer the project would be done in 40 days, but the project requires 42 days, then instead of having zeroes along the critical path, you will have negative twos (-2s). This is called negative slack. You will need to use schedule compression techniques to reduce the length of the project.
 
Note that the last two paragraphs involved only the critical path activities. None of the paths that you did not highlight in the first paragraph matter. They are all irrelevant -- up to this point.
 
Slack is also called "float" because you can move the activity forward up three days. Imagine a small cereal bowl floating in a large sink. It has room to float around. The bounds within which it can float are set by the edges of the sink. Similarly, an activity with positive slack can float within bounds set by parallel activities in the critical path.
 
Here's another confusing point. Suppose activities B and C are parallel to each other. That is, both can start as soon as activity A is done, but both must by done before activity D can start.
 
Activity B
Slack = 2 days
Duration = 4 days
 
Activity C
Slack = 0 days
Duration = 6 days
 
How long will the path that contains Activity B take? If you answered, 4 days, think again. Suppose activity A ends on day 10. Activity C takes 6 days, so activity D cannot start until day 16. So how long does the path containing activity B take? The path takes 4 days of activity plus two days of slack. It takes the same time as the longer activity (C) that it parallels.
 
Two activities done in parallel cannot be completed any faster than the longer activity. For this reason, it is a waste of time to look for "shorter" Start-to-Finish paths.
 
Activities or paths with slack (float) do not affect how long the project takes. However, there are two exceptions.
 
First, if the PM uses schedule compression techniques to shorten the project (for example, from 42 days to 40 days), then at least some of the activity durations or the relationships between activities change.
 
When the PM recalculates how long the project will take, the critical path may change. One critical path activity that had -2 slack might now have a slack of 1, so it is no longer on the critical path; and another activity that formerly had a slack of +1 and was not on the critical path may now have a slack of zero and lie on the critical path.
 
Second, every activity has risk. You can lower the risk of a non critical path activity by starting it early. You cannot do that with a critical path activity, so it carries more risk. If something goes wrong with a non critical path activity, if it takes long enough, it can still prevent the start of a critical path activity that follows it. On paper during planning, it does not affect the project's duration, but during execution, it can.
 
I hope I clarified more than I confused. Good luck!

08 March 2013

Forcing versus Withdrawal for Conflict Resolution

Is it true that the Forcing conflict resolution technique is worse than Withdrawal?

Withdrawal can have negative or positive consequences. On the negative side, left to themselves, people may escalate the conflict to the point that the PM loses control. While time passes, risks may evolve into issues, or issues into problems.

On the other hand, people may calm down and consider each others' needs and opinions. In time, they may voluntarily find ways to meet all needs, or at least reach a compromise. They might also find a new solution. So the problem may solve itself. It's important for the PM to respect the team's ability to solve problems and allow them "space" to do so.

Forcing always has losers and creates the risk of driving a less-than-optimal solution. People don't disagree about issues unless somebody sees an aspect that the others do not see. Odds are, if you force a solution, you've missed an opportunity to find a better solution.

Forcing also implies showing disrespect for the "losers," so it demotivates them. Their decrease in performace can becomes a drag to the team. The negative feelings and the drag, in turn, affects the whole team's performance.

You may not have time to find better solutions. Although forcing ranks as the worst technique, circumstances may force you to use it. If you force a solution, you need to follow up with the "losers" to identify the negative consequences. This shows respect for their needs and their perceptions. It also allows you to find ways to mitigate any shortcomings in the forced solution.

06 March 2013

The Lobbyist on the Project Management Team

You are the project manager in an aircraft manufacturing company developing a new range of supersonic fighter planes. Since government approval and involvement are essential, you hire a lobbying firm to get government support to prevent unnecessary changes in your project. Which process is this an example of? (Source unknown)
While aircraft manufacturers conduct some research into designs and materials that they can incorporate into new aircraft, governments usually sponsor development of fighter jets.
 
Scope creep happens in almost all defense projects.
 
For example: 
  • The Defense Department wants the aircraft to provide certain capabilities for the Air Force.
  • Then the Navy wants compromises in the design so the jets can take off from carriers.
  • The Army and Marines add their particular use cases.
  • Allies want introperability with their systems.
  • Later, one politician wants to cut costs,
  • another wants the aircraft to use inadequate landing gear designed by the manufacturer in his home town,
  • and over 600 politicians and thousands of bureacrats want to influence the project.
  • Meanwhile, competitors and the nation's adversaries develop new technologies to which the designers must respond.
  • And one of the political parties, along with the press, begin mocking your aircraft by calling it an Imperial Tie Fighter.
If you let it, the politics will multiply the cost twentyfold, drag out the schedule an extra 15 years, and make your company a laughingstock. By the time of the first production run, the aircraft will already be obsolete.
 
The same sort of changes can happen in any project. One way to control the risk of scope change is to refuse to make changes, but too little flexibility can create customer dissatifaction and cost you future business.
 
For a better way to reduce the risk of scope creep, maintain close personal relationships with the stakeholders, keep them informed of the costs of changes, and negotiate agreements that best serve the business case.
 
The PM cannot always do this, so the company hires a lobbyist with exceptional people skills and knowledge of the bureacratic systems. The lobbyist uses various methods to convince the politicians and bureaucrats to resist tinkering with the project requirements.
 
In process terms, hiring a lobbyist does not proceed from the Project Communications Management processes. Lobbying does not contribute directly to producing the product or providing a service. A first pass through the Identify Stakeholders and Plan Communications processes would assume everything goes as planned and would focus on required reporting and coordination. The lobbyist's job goes far beyond that.
 
If the team identifies scope creep as a risk, they make a note to consider it later when they follow the Identify Risks process. They would, at that time, add recruiting a lobbyist to the Risk Management Plan portion of the integrated Project Management Plan.
 
Don't forget that, as a member of the project team, the lobbyist becomes a stakeholder. For example, the team must add the lobbyist's tasks to the WBS and estimated costs during the next iteration of project planning. They must also consider the lobbyist's information needs during the next iteration of the Project Communications Management processes.

24 February 2013

Project Selection

For project selection, the Project Management Institute's (PMI's) Project Management Body of Knowledge (PMBOK) Guide assumes you have more than one project from which to choose. By analyzing the options, you can determine which has the greatest value to the company. The formal method for choosing the best option is called a project selection method.
 
Suppose I have to choose between
  • fixing my child's favorite meal and leftovers for my wife, or
  • fixing my spouse's favorite and cheese mac for my child.
So I ask, "which gives me the better Return on Investment (ROI)?" To answer the question, I consider
  • How much time and money it will take
  • How much of a mess I will have to clean up
  • Does it align with my goals (fun vs. study time)
  • Rewards (somebody else WILLINGLY taking out the trash)
  • How long it will take to reap the rewards
  • Risks (what if I overcook the macaroni? or burn the steak?)
A Project Manager (PM) will place a priority on each criterion and score the probable outcomes. The sum of the weighted scores for each option yields a total score for that option.
I did this with my daughter last year when she needed to buy a car. The result surprised me and was not at all what I expected, but it turned out to be a great choice.

The primary use of project selection is for choosing between projects. However, one can also used it during the project life cycle. The projected ROI of a project can change, for example, due to changing market or regulatory conditions. If the ROI falls, it might be worth canceling the project so the funds and resources can be applied to a more promising project. This is a special case of selecting between competing opportunities.
 
The executives of a company I won't name signed a contract to deliver a product on a certain date. If the company failed to deliver on that date, the company would have to pay liquidated damages; and if the company canceled the project, it would have to pay penalties.
 
Unfortunately, the executives failed to have Engineering review the contract. It turned out that the company could not meet the deadline. The PM tried schedule compression, but as risks turned into issues, it became clear that the project could not meet its deadline.
 
What should they have done? The company should have used the project selection method to choose between
  • Completing the project and paying the liquidated damages
  • Canceling the project and paying the penalties.
Remember, the considerations aren't always directly related to the project. Things such as the company's reputation, the future value of establishing a market presence, or future business based on this project's design work have value, too. For example, cell phone companies often sell cell phones at a loss because they make their money on the service contracts.

Copyright 2011, Richard Wheeler

09 February 2013

Project Management Career Path

In terms of study, what path should one take to become a project manager?

First, unless you have several years of project management work experience, I would suggest obtaining the Project Management Institute's (PMI's) Certified Associate Project Manager (CAPM) certification. After that, study the qualifications for the Project Management Professional (PMP) certification and create a plan based on those qualifications. The plan should include studying PMI's Project Management Body of Knowledge (PMBOK) Guide and added studies based on the PMBOK Guide's process knowledge areas.

Second, familiarize yourself with the International Counsel on Systems Engineering (INCOSE) Systems Engineering Body of Knowledge (SEBOK). After achieving PMP certification, pursue INCOSE's certifications. PMI certification will give you a top-down perspective across all departments whereas INCOSE's certifications will give you a bottom-up understanding of the engineering processes and products.

Studying these two knowledge areas in this order should provide a faster path, on paper, to project management and beyond. However, if you would prefer a career path leading to a Chief Engineer title, you might reverse the order. Pursing Engineering in Training (EIT) and then Professional Engineer (PE) certifications would be valuable on the technical career path, too.

Third, study people, develop lots of relationships (focus on the personal aspects and what you can do for them, not on what you can get out of them), and find at least one mentor other than your supervisor. These are critical.

08 February 2013

Politics and the Project

Question:

Cultural norms include a common knowledge regarding how to approach getting things done. It also takes into account formal and informal leaders who exist in almost every organization. Most organizations have developed unique cultures that manifest themselves in many ways. Which attributes of a company culture is NOT consistent with the discussion of cultural "norms"?

A. shared vision, values, beliefs, expectations
B. policies, methods and procedures
C. consistent political views
D. view of authority relationships

I was given answer as "C".
Shared vision, values, beliefs, expectations; political views; and views of authority relationships are all cultural factors. Each is a valid topic of discussion to the degree that it affects the project and the organization.

Political views include both those related to national government and those related to the company goals, culture, and hierarchy.

Western employees are taught that religious and political views are inappropriate topics. However, Political Correctness (PC) is alive and well. For example, some countries suppress "subversive" or "counter revolutionary" political views. This can affect project success.

Even in the USA, many employers will fire you if you oppose certain movements such as homosexual marriage or affirmative action (discrimination in favor of disadvantaged minorities). The reasoning goes like this:
  • Diversity has value.
  • People who oppose a PC (politically correct) view create a workplace that is hostile to favored minorities and an atmosphere where conflict may arise.
  • This hurts members of those minorities, limits diversity, subjects the company to legal liability, and disrupts teamwork.
  • Thus, inconsistent political views concerning some topics can hurt the project.
You don't have to like PC, but it exists. PMs have to deal with it and sometimes even enforce it.

Consider a different meaning of "political views:" Every organizational hierarchy has "office politics." Competition, conflicting opinions, and popularity can affect whom you can rely on. A stakeholder or resource may oppose you, or others may not support your resource. Such factors affect how one succeeds in getting things done.

We may say (C) is an inappropriate topic, but political views are certainly a part of cultural norms, and some version of PC is enforced anywhere you go. Moreover, the question is not, "what is appropriate," but "which attributes of a company culture is [sic] not consistent with the discussion of cultural 'norms'?"  (C) cannot be correct.

While culture may affect policies, methods, and procedures, they are classified not as part of the enterprise environment (that is, external factors that affect the project), but rather as organizational process assets. (B) is correct.

Copyright (C) 2013, Richard Wheeler. Permission granted for use not involving publication.